The scope included:
- 8 off 2.5MVA Transformers with ring main units
- 2 off 11 KV MV switchboards
- 30 plus LV switchboards – up to 2000amps
- 150 plus special factory built distribution boards
- 100 plus standard distribution boards
The scope increased for ICS during the project to assist in ensuring the project met the overall project objectives.